back
loading skill details...
Use when pausing or transferring work; deliver a versioned handover with one actionable resume point.
--- name: resumable-handover description: Use when pausing or transferring work; deliver a versioned handover with one actionable resume point. --- # Resumable Handover Turn a status dump into a note the next person can resume from without reconstructing the conversation. ## When to use - A PDF is generated but its rendered output has not been accepted. - A shift ends with one ready task and another waiting on a named event. - A new revision changes one component and older checks still cover the rest. - An interrupted request may have taken effect and must not be repeated. - Accepted work needs an explicit closeout at transfer. ## When NOT to use - The user asks you to finish the repair now, not write a transfer note. - The deliverable is a release announcement with no work to transfer. - The immediate task is to reconcile a receipt, not transfer ownership. - The same operator only needs a quick progress update. - The project is new and has no execution state yet. ## Core rules 1. **Deliver from the material you have.** A documented gap is more useful than a withheld handover. 2. **Apply each current update only to the fact it replaces.** A new revision does not reopen unrelated settled decisions. 3. **Bind evidence to version and scope.** An older check can support unchanged content but cannot prove a new preview happened. 4. **Separate paused, cancelled and unknown.** They imply waiting for a trigger, removing from the queue, and reconciling an existing attempt respectively. 5. **Keep original identity for unknown effects.** The available ID, target, time and submitted fingerprint let a successor query without replay. 6. **Name a real backup or say none.** An invented restore location is useless when the trigger fires; use `not provided` if records are silent. 7. **Close accepted work.** Optional improvements are not handover actions. ## Workflow ### 1. Put the goal and state at the top - Write what acceptance means, not just the name of the project. - Use done, not done, paused, cancelled, or outcome unknown. - If parts differ, label them separately under the overall state. - If a criterion is missing, mark it `not provided`; don't invent one. ### 2. Scope the finished evidence - Match the current explicit update to the older statement it supersedes. - Keep unrelated facts and avoid re-confirming settled points. - List result, evidence locator, version, and the surface it covers. - Carry forward relevant checks on unchanged material as historical evidence, not fresh runs. - Distinguish a missing check from a failed check. ### 3. Order only necessary work - Put independent ready work before waiting work. - Place a prerequisite before a dependent check. - Attach the explicit resume condition to each paused item. - Remove cancelled actions even if they still appear in an older checklist. - Put recovery in a conditional branch, not the normal queue. ### 4. Name the first action - Write **verb + object + completion signal**. - Use an actual path or entry point only if provided. - If no work is ready, name the exact event being waited on. - For unknown effects, keep the original request metadata; suggest a read-only lookup of that request or a bounded wait. Never resend. - If the goal is accepted, write **Done, no next action**. ### 5. Record recovery and deliver - Say what changed, where the actual backup is, and what triggers restore. - If the change has no backup, say `none`; if unknown, say `not provided`. - Do not perform the restore or run the remaining actions. - If draft and submit tools are provided, read the necessary material, write the complete note, then submit it in order in the same round. ## Output template ```markdown # Handover — [deliverable] Goal / acceptance: [result and observable signal] Overall state: [done / not done / paused / cancelled / outcome unknown] ## Finished and evidenced - [result] | [evidence locator] | [version] | [coverage] ## Remaining in order 1. [ready prerequisite → expected result] 2. [dependent or waiting item → exact condition] ## Resume point - First action: [verb + object + completion signal] - If nothing is ready: [specific wait event / Done, no next action] - Unknown request: [ID / target / submit time / submitted fingerprint] - Original-only lookup or bounded wait: [entry point / limit / end condition] ## Changes and recovery - Changed: [object] | Backup: [actual location / none / not provided] - Restore only if: [supplied trigger] - Gaps: [facts not provided or checks not run] ``` Omit optional sections only when inapplicable, not when they contain a material gap. ## Worked examples ### Example 1 — The cover changed after export **Input.** `review/body.md` records a body-content pass for `guide-r6.pdf`. Revision r7 replaces only the cover. `exports/guide-r7.pdf` exists but nobody opened it. Acceptance means a rendered guide with no clipped title. The cover backup is `backup/cover-r6.svg`. The supplied restore trigger is title clipping in the new preview. **Bad** > r7 is done; review passed. Recheck everything before release if you want. **Good** > Goal: r7 rendered with no clipped title. State: not done; preview pending. > Finished: `review/body.md` covers r6 body content, unchanged in r7. It does not cover the r7 cover render. > First action: open `exports/guide-r7.pdf`; done when the cover is visible and title clipping can be judged. > Remaining: record the preview result. If the title clips, restore only the cover and recheck the affected render. > Change: cover only. Backup: `backup/cover-r6.svg`. Restore trigger: clipped title in the r7 preview. **Why it works.** The next person gets the file, the visual signal, and the affected scope without rerunning unrelated checks. ### Example 2 — A ready index update and a paused import **Input.** Report r3 totals passed in `checks/totals.txt`. The staging index update is independent. Import `im-42` to staging timed out at 14:10 UTC; submitted checksum `f7a`. The operator paused import work until the window reopens and cancelled the duplicate export. Nothing changed during the handoff. **Bad** > The import failed. Retry it on your shift, regenerate the duplicate export, and redo the totals check. **Good** > Goal: update the staging index and reconcile the existing import. State: not done. > Finished: report r3 totals pass in `checks/totals.txt`. > First action: update the staging index; done when it lists r3. This does not depend on the import. > Import: paused until the operator reopens the window; outcome unknown. Original: `im-42`, staging, 14:10 UTC timeout, checksum `f7a`; submit time not provided. > After reopening: check `im-42` once in its original status view or retain unknown if unavailable. Do not resend. > Duplicate export: cancelled, not queued. No changes made during handover; no recovery action. **Why it works.** Ready work advances without treating a timeout as permission to replay. ## Common mistakes / red flags | What you see | What to put in the note instead | |---|---| | “Everything passed” linking an old revision | Name the revision and the unchanged surface it supports. | | “Resume when ready” | Name the event or artifact that releases the pause. | | “Retry the timed-out request” | Preserve original identity and specify one lookup or bounded wait. | | “Backup should be in the archive” | Give the recorded location, `none`, or `not provided`. | | A cancelled item appears in TODO | Remove it from the queue; retain cancellation only as useful context. | | Accepted work still has a check queued | Write “Done, no next action.” | ## Self-check - [ ] Goal and current state are at the top. - [ ] Updates override only their matching facts. - [ ] Finished evidence names locator, version and coverage or marks gaps. - [ ] Ready work precedes waiting work; prerequisites precede dependents. - [ ] The first action has an object and signal, or an exact wait event. - [ ] Unknown attempts retain original identity and are not queued for replay. - [ ] Changed objects have a backup status and a supplied restore trigger or explicit gap. - [ ] Accepted work has no next action; cancelled work is not queued. ## Stop at delivery The note is ready when a successor can resume, wait for a named event, or see nothing remains. Submitting the note does not complete the business task. Do not run remaining actions or delay the note to perfect the list.
don't have the plugin yet? install it then click "run inline in claude" again.