Write a weekly engineering status report for a team, service, or initiative. Use when asked to write a team update, weekly engineering report, sprint status...
---
name: engineering-weekly-report
description: "Write a weekly engineering status report for a team, service, or initiative. Use when asked to write a team update, weekly engineering report, sprint status email, or standing team communication to stakeholders. Produces a concise, scannable weekly report covering shipping progress, metrics, decisions, blockers, and next-week priorities."
homepage: https://mohitagw15856.github.io/pm-claude-skills/skill/engineering-weekly-report.html
metadata:
{
"openclaw": { "emoji": "⚙️" }
}
---
# Engineering Weekly Report
Produce a weekly engineering status report that a team can send to stakeholders, their engineering manager, and the team itself. The format is fixed week-over-week so readers know exactly where to look — shipping progress at the top, decisions in the middle, risks and next steps at the bottom. The report must be readable in under 2 minutes. Avoid prose walls: use bullet points, status tags, and short tables. If metrics are not provided, leave the metrics section with [data needed] markers rather than fabricating numbers.
## Required Inputs
Ask for these if not already provided:
- **Team name and report period** — team name plus week number or date range (e.g., "Platform Team, Week 21, May 12–16")
- **Work items shipped this week** — what was completed and released or merged
- **Work items in progress** — what is actively being worked on, with rough percent-complete if known
- **Blocked items** — what is blocked, who owns the block, and what is needed to unblock
- **Key decisions made** — any architecture, process, or priority decisions made this week
- **Decisions needed next week** — any decisions that need to be made soon and who needs to make them
- **Risks and escalations** — anything that threatens next week's commitments or needs leadership visibility
- **Next week's top priorities** — the 3–5 things the team plans to accomplish next week
Optional but useful:
- **Key metrics** — reliability (error rate, p99 latency), velocity (story points completed), or other health indicators
- **Team health notes** — PTO, new joins, attrition, morale signals worth noting
- **Sprint or iteration number** — if the team runs sprints
## Output Format
---
# Engineering Weekly Report — [Team Name]
**Week:** [Week Number] | [Date Range, e.g., May 12–16, 2025]
**Author:** [Name or Team Lead]
**Distribution:** [e.g., Eng leadership, Product, Team]
---
## Shipping Progress
### Shipped This Week
| Item | Description | Impact |
|------|-------------|--------|
| [Feature / Fix / Infra change] | [One-line description] | [Who benefits / what it unblocks] |
| [Feature / Fix / Infra change] | [One-line description] | [Who benefits / what it unblocks] |
| [Feature / Fix / Infra change] | [One-line description] | [Who benefits / what it unblocks] |
### In Progress
| Item | Owner | Status | Target Ship |
|------|-------|--------|-------------|
| [Work item] | [Name] | [~40% / On Track / At Risk] | [Date or Sprint] |
| [Work item] | [Name] | [~70% / On Track / At Risk] | [Date or Sprint] |
| [Work item] | [Name] | [~20% / On Track / At Risk] | [Date or Sprint] |
### Blocked
| Item | Blocked Since | Blocker Description | Owner | Needed To Unblock |
|------|--------------|--------------------|----|-------------------|
| [Work item] | [Date] | [What is blocking progress] | [Name] | [Specific ask — decision, resource, dependency] |
If no items are blocked: *No active blockers.*
---
## Key Metrics
*Metrics reported as of [Date]. Prior week in parentheses.*
| Metric | This Week | Last Week | Trend | Target |
|--------|-----------|-----------|-------|--------|
| Error rate (5xx) | [X%] | [X%] | [↑ / ↓ / →] | < [threshold] |
| p99 latency | [Xms] | [Xms] | [↑ / ↓ / →] | < [threshold] |
| Deployment frequency | [X deploys] | [X deploys] | [↑ / ↓ / →] | [target] |
| Story points completed | [X] | [X] | [↑ / ↓ / →] | [sprint target] |
| On-call page volume | [X pages] | [X pages] | [↑ / ↓ / →] | < [threshold] |
**Metrics notes:** [Any context that makes the numbers meaningful — e.g., "Error rate spike on Tuesday tied to downstream dependency outage, resolved by EOD."]
If metrics are not provided: replace table rows with `[data needed — provide metric values for this section]`.
---
## Decisions
### Made This Week
| Decision | Rationale | Owner | Stakeholders Informed |
|----------|-----------|-------|----------------------|
| [Decision description] | [Why — 1 sentence] | [Name] | [Yes / No — who] |
| [Decision description] | [Why — 1 sentence] | [Name] | [Yes / No — who] |
If no decisions were made: *No major decisions this week.*
### Needed Next Week
| Decision | Context | Deadline | Decision Owner |
|----------|---------|----------|----------------|
| [What needs to be decided] | [Why it matters, what happens if delayed] | [Date] | [Name or role] |
If no decisions are pending: *No decisions pending.*
---
## Risks and Escalations
| Risk | Likelihood | Impact | Mitigation | Escalate To |
|------|-----------|--------|-----------|-------------|
| [Risk description] | [High/Med/Low] | [High/Med/Low] | [What we're doing about it] | [Name/role if escalation needed] |
**Escalations this week:** [Any item that needs immediate leadership attention — call it out explicitly here, do not bury it in a table row. If none: "None."]
---
## Team Health
| Item | Status |
|------|--------|
| Team capacity this week | [X of Y people at full capacity] |
| PTO / out of office | [Names and dates, or "None"] |
| New joins / departures | [Name, role, and date, or "None"] |
| On-call this week | [Name] |
| On-call next week | [Name] |
**Team notes:** [Any morale, workload, or team dynamic signals worth surfacing — keep this factual and constructive. If nothing to note: omit this line.]
---
## Next Week's Priorities
*The [3–5] things this team will ship or meaningfully advance next week.*
1. **[Priority item]** — [One sentence: what done looks like and who owns it]
2. **[Priority item]** — [One sentence: what done looks like and who owns it]
3. **[Priority item]** — [One sentence: what done looks like and who owns it]
4. **[Priority item]** — [One sentence: what done looks like and who owns it]
5. **[Priority item]** — [One sentence: what done looks like and who owns it]
**Capacity risk:** [If the team is at reduced capacity next week (PTO, incidents, etc.), note it here so stakeholders calibrate expectations.]
---
## Appendix: Sprint Scorecard (if applicable)
| Sprint | Committed | Completed | Completion Rate | Carried Over |
|--------|-----------|-----------|----------------|--------------|
| Sprint [N-1] | [X pts] | [X pts] | [X%] | [X pts] |
| Sprint [N] (current) | [X pts] | [X pts — partial] | [X% at midpoint] | TBD |
---
*Questions or corrections: [Slack channel or email] | Next report: [Date]*
---
## Quality Checks
- [ ] Every blocked item names a specific owner and states what is concretely needed to unblock it — not just "waiting on X"
- [ ] Decisions-needed table includes a deadline and a named decision owner, not a vague "TBD"
- [ ] Metrics table is either populated with real numbers or explicitly marked `[data needed]` — no fabricated metrics
- [ ] Next week's priorities are written as outcomes ("ship X", "complete Y migration") not as activities ("work on X")
- [ ] Escalations that need leadership attention are called out explicitly in the Risks section — not just buried in a table row
- [ ] The entire report is readable in under 2 minutes — if it is longer than one printed page, trim it
- [ ] Report period (week number and date range) is clearly stated in the header
## Anti-Patterns
- [ ] Do not fabricate metrics — if data is not available, mark the field as `[data needed]` rather than estimating; stakeholders making decisions on invented numbers is actively harmful
- [ ] Do not write next week's priorities as activities ("work on X") — they must be outcomes ("ship X", "complete Y migration") so stakeholders can evaluate whether the team delivered
- [ ] Do not bury escalations inside a risk table row — anything needing leadership attention must be called out explicitly in the Escalations section
- [ ] Do not list blocked items without naming a specific owner and a concrete unblocking action — "waiting on X" is not a blocker entry, it is a placeholder
- [ ] Do not write a report that exceeds two printed pages — length signals the author has not done the editorial work of deciding what matters to stakeholders
don't have the plugin yet? install it then click "run inline in claude" again.
restructured original document into implexa's six-component format, added explicit decision points for common edge cases (missing metrics, no items shipped, vague blockers), expanded inputs section with context and assumptions, detailed each procedure step with clear input/output contracts, added outcome signals tied to stakeholder clarity and trend visibility, preserved all original templates and quality checks.
produce a weekly engineering status report that teams send to stakeholders, managers, and themselves. the format is fixed week-over-week so readers know exactly where to look: shipping progress at the top, decisions in the middle, risks and next steps at the bottom. the report must be readable in under 2 minutes. use this skill when asked to write a team update, weekly engineering report, sprint status email, or standing team communication. avoid prose walls: use bullet points, status tags, and short tables. if metrics are not provided, leave the metrics section with [data needed] markers rather than fabricating numbers.
required information to gather:
optional inputs:
external connections:
context assumptions:
collect report metadata
gather shipping progress data
compile metrics section
record decisions
surface risks and escalations
capture team health
define next week's priorities
add appendix (conditional)
assemble final report
if metrics are not available:
if no items were shipped this week:
if no work is in progress:
if a blocked item lacks a specific owner or unblocking action:
if a decision is pending but has no named owner:
if an escalation is flagged but has no escalation path:
if a priority is written as an activity instead of an outcome:
if the report exceeds two printed pages:
if team capacity next week is reduced (PTO, incident response, etc.):
format: markdown document with the following sections in order:
file location: typically saved as markdown (.md) file in a shared drive, wiki, or email. filename convention: engineering-report-[team-slug]-[week-number].md (e.g., engineering-report-platform-team-week-21.md)
data format: all tables use markdown syntax with pipe delimiters. all trends use arrow indicators (↑ / ↓ / →). all blockers name a specific owner and unblocking action. all decisions name an owner. all priorities are outcomes, not activities.
completeness criteria:
the user knows the skill worked when: